General
|
Plant
|
Incheon Power Plant
|
|
Customer
|
Korea midland Power Co., Ltd. (KOMIPO)
|
|
Contract awarded
|
Sep. 2001
|
|
Start up
|
Jun. 2002
|
|
Quantity of unit
|
2 sets (Total 2units)
|
|
Capacity per unit
|
250MW Based on LSWR & LNG
|
|
Flue gas volume
|
727,258 Nm3/hr x 357°C
|
|
Emissions(Design Condition)
|
4/4 Load Condition
|
Design Data
|
Item
|
Raw Gas
|
Treated Gas
|
|
Guaranteed
|
Expected
|
|
NOx(ppm)
LNB(50%NR ~ BMCR)
SCR
|
350
350
210
|
210
80
|
≤20 ≤80
|
|
NH3 Slip(ppm)
|
|
5
|
≤5
|
There is in the basis of 4% O2 dry volume.
It is 5 hours after just Boiler ignition for NOx of SCR
& NH3 Slip.
Major Items
2 units-Complete Power Plant System Consist of
- Low NOx Burner
- SCR (Selective Catalytic Reduction)
- Ammonia Injection System
- Ammonia storate & handling system
- A.I.G.(Ammonia Injection Grid)
- I.D.Fan (Air pitch control system)
- B.M.S. System(Burner Management System)
|
|
|
|
| |
|
|
|